LAB CHILLER INSTALLATION

LAB CHILLER INSTALLATION's featured image

Detail / Description:

ZJ Building Services were asked to replace 3 chillers, one which was for comfort cooling the other two were for the process cooling within a laboratory environment.

The process cooling system was previously poorly maintained and resulted in corroded pipework which required replacement along with the circulating pumps which were replaced with higher efficiency pumps which will result in additional savings.

All new power and a new controls were incorporated within this turnkey projects.

Total Project Size: Confidential

Strategy: Design & Build

Asset Type: Manufacturing Laboratory

Region: South West

Sites: Petersfield

Explore our projects