TOWER 42 DECARBONISATION PROJECT
Detail / Description:
ZJ Building Services were engaged by our facilitates management repeat client to undertake the enabling package for a large air source heat pump installation within the centre of London.
ZJBS undertook the relocation of tennant critical cooling and replacement and relocation water tanks. All works were undertaken in a live environment with critical system cooling downtime limited to 12 hours even with temporary arrangements.
Replacing the water tanks was limited to 1 days downtime on a Sunday when the restaurant was closed meaning for both sets of works meticulous planning was required to ensure that the installation was completed and a small tie over session was all that was required.
ZJBS undertook the full M&E scope of works, with the exception of controls that was instructed by the main contractor.
Total Project Size: Confidential
Strategy: Sub Contact Installation Only
Asset Type: Commercial Plant Rooms
Region: London
Sites: London – Tower 42